Books
![]() ![]() ![]() ![]() ![]() |
Montaj Hattı Planlama Modelleme ve Optimizasyon İbrahim Küçükkoç Ekim 2020, Nobel Yayınevi ISBN: 978-625-406-375-6. ![]() |
Book Chapters
Ibrahim Kucukkoc, Zixiang Li, Qiang Li (2021). 2D Nesting and Scheduling in Metal Additive Manufacturing![]() |
|
![]() |
Ibrahim Kucukkoc (2021). Metal Additive Manufacturing: Nesting vs. Scheduling![]() |
![]() |
Ibrahim Kucukkoc, Gulsen Aydin Keskin, Zixiang Li (2021). A Differential Evolution Algorithm for Balancing Mixed-Model Disassembly Lines![]() |
![]() |
Li, Q., Zhang, D.Z., Kucukkoc, I., He, N. (2020). Heuristic Techniques for Real-time Order Acceptance and Scheduling in Metal Additive Manufacturing![]() Karaoglan, A.D., Atalay, I., Kucukkoc, I. (2020). Distance Constrained Vehicle Routing Problems: A Case Study using Artificial Bee Colony Algorithm ![]() |
![]() |
Kucukkoc, I. (2018). A Non-dominated Sorting Approach to Bi-objective Optimisation of Mixed-Model Two-Sided Assembly Lines![]() |
Edited Books
-
Kucukkoc, I., Mustafee, N. (2013), OR55 Keynote Papers and Extended Abstracts (Edited Book)
, OR55 Annual Conference, The OR Society UK, University of Exeter, ISBN: 0903440555.
-
Kucukkoc, I. (2013), YOR18 Keynote Papers and Extended Abstracts (Edited Book)
, YOR18 Biennial Conference, The OR Society UK, University of Exeter, ISBN: 0903440520.
Projects
-
National Natural Science Foundation of China, Grant Number: 62173260
Intelligent scheduling for collaborative operations of reconfigurable man-robot cooperative two-sided assembly line production and maintenance
Researcher, National Natural Science Foundation of China, 01/2022-12/2025, Budget: 580000 (Chinese Yuan)
-
BAU-Scientific Research Project, 2022/086
Development of a Metaheuristic Algorithm Considering Batch Delivery in Additive Manufacturing Machine Scheduling Problems (Eklemeli Üretim Makine Çizelgeleme Problemlerinde Toplu Teslimatı Dikkate Alan Bir Metasezgisel Algoritma Geliştirilmesi)
Coordinator, Balikesir University, 05/2022-11/2023
-
The International Research Cooperation Seed Fund of Beijing University of Technology (China), B24
U-shaped Assembly Line Balancing Under Uncertain Environment
Researcher, Beijing University of Technology, 07/2018-12/2019, Budget: 50000 (Chinese Yuan)
-
BAU-Scientific Research Project, 2017/179
Sıralama-bağımlı karışık-modelli iki-taraflı montaj hatlarının stokastik görev zamanları dikkate alınarak modellenmesi ve optimizasyonu
Coordinator, Balikesir University, 06/2017-12/2018
-
BAU-Scientific Research Project, 2011/40
Mixed Model Assembly Line Balancing Problems and An Application with Genetic Algorithms
Researcher, Balikesir University, 12/2010-07/2011